  "license": "CC BY 4.0",
  "cite_as": "Behind the Watt, behindthewatt.com, CC BY 4.0",
  "classification": "third_party_reported_not_btw_verified",
  "note": "Reported project pipeline from a cited third-party inventory. Do not add to BTW verified operating capacity.",
  "summary": {
    "projects": 74,
    "projects_with_capacity": 70,
    "reported_gw": 143.3,
    "statuses": {
      "Proposed": {
        "projects": 70,
        "reported_mw": 137691
      },
      "Under Construction": {
        "projects": 4,
        "reported_mw": 5628
      }
    },
    "top_states": [
      {
        "state": "TX",
        "reported_gw": 63.2
      },
      {
        "state": "WV",
        "reported_gw": 15.5
      },
      {
        "state": "OH",
        "reported_gw": 14
      },
      {
        "state": "PA",
        "reported_gw": 13.7
      },
      {
        "state": "UT",
        "reported_gw": 13
      },
      {
        "state": "WY",
        "reported_gw": 7
      }
    ]
  },
  "announcements": [
    {
      "name": "Fermi America Project Matador",
      "state": "TX",
      "county": "Carson County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2027",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 11280,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Portsmouth Powered Land Project",
      "state": "OH",
      "county": "Pike County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 9200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Stratos Project/Wonder Valley",
      "state": "UT",
      "county": "Box Elder County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2036",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 9000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Monarch Compute Campus Power Plant",
      "state": "WV",
      "county": "Mason County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2031",
      "generating_technology": "Internal Combustion Engine; Unknown",
      "reported_capacity_mw": 8160,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "GW Ranch Energy Center",
      "state": "TX",
      "county": "Pecos County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2027",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 7650,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Nexus Data Center Hubbard Power Plant",
      "state": "TX",
      "county": "Hill County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Internal Combustion Engine, Simple Cycle, Combined Cycle",
      "reported_capacity_mw": 7227,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Texas Power Generation Hub (Nextera-Comstock Power Station)",
      "state": "TX",
      "county": "Anderson County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028/2029/2031/2032",
      "generating_technology": "Combined Cycle, Simple Cycle",
      "reported_capacity_mw": 5200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Chevron AI Data Center Project",
      "state": "TX",
      "county": null,
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 5000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "FO Permian Partners Data Center Complex",
      "state": "TX",
      "county": "Midland County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 5000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Homer City Generating Station",
      "state": "PA",
      "county": "Indiana County",
      "project_type": "New",
      "operating_status": "Under Construction",
      "expected_operating_year": "2029",
      "generating_technology": "Simple Cycle, Combined Cycle",
      "reported_capacity_mw": 4678,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Shippingport Power Station (Formerly Bruce Mansfield Power Plant)",
      "state": "PA",
      "county": "Beaver County",
      "project_type": "New (coal to gas conversion)",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Simple Cycle, Steam Turbine",
      "reported_capacity_mw": 3641,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Tenaska Gas Power Plant",
      "state": "NE",
      "county": null,
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2029",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 3000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Kilby Power Plant",
      "state": "TX",
      "county": "Reeves County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Combined Cycle, Simple Cycle",
      "reported_capacity_mw": 2869,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Adams Fork Data Center Energy Campus",
      "state": "WV",
      "county": "Mingo County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 2850,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Adams Fork Harless Data Center Energy Campus",
      "state": "WV",
      "county": "Mingo County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 2850,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "TECfusions Keystone Connect Power Plant",
      "state": "PA",
      "county": "Westmoreland County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2031/Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 2700,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "VoltaGrid ABI-1 Electric Generating Station",
      "state": "TX",
      "county": "Shackleford County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2026",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 2582,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Project Jupiter East Microgrid",
      "state": "NM",
      "county": "Dona Ana County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q4 2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 2393,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Schahfer Generating Station",
      "state": "IN",
      "county": "Jasper County",
      "project_type": "Expansion",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 2300,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "BFC Power and Cheyenne Power Hub",
      "state": "WY",
      "county": "Laramie County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Combined Cycle, Simple Cycle",
      "reported_capacity_mw": 2200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Miller Generating Station",
      "state": "WY",
      "county": "Carbon County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Combined Cycle, Simple Cycle",
      "reported_capacity_mw": 2089,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "NRG Tolar Power Center",
      "state": "TX",
      "county": "Hood County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 2014,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Alpha Digital Campus Power Plant",
      "state": "TX",
      "county": "Reeves County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027/2028",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 2000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Creekstone Delta Gigasite Data Center",
      "state": "UT",
      "county": "Millard County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2030/2035",
      "generating_technology": "Internal Combustion Engine; Unknown",
      "reported_capacity_mw": 2000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "New Era Lea County Power Station",
      "state": "NM",
      "county": "Lea County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 2000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Kingsboro NetZero Data Center and Power Station",
      "state": "NC",
      "county": "Edgecombe County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2029",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 1800,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Project Jupiter West Microgrid",
      "state": "NM",
      "county": "Dona Ana County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 1676,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Ridgeline Power Plant",
      "state": "WV",
      "county": "Tucker County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 1656,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Casper Campus Power Station",
      "state": "WY",
      "county": "Natrona County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 1500,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Crusoe-Blue Energy Data Center Power Station",
      "state": "TX",
      "county": "Victoria County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 1500,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Joule Capital Data Center and Power Station",
      "state": "UT",
      "county": "Millard County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027/2028",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 1500,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Longhorn Data Center Power Plant",
      "state": "TX",
      "county": "Taylor County",
      "project_type": "Expansion",
      "operating_status": "Proposed",
      "expected_operating_year": "Q1 2027",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 1398,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "xAI Southaven Power Plant",
      "state": "MS",
      "county": "DeSoto County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 1240,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "CloudBurst Data Center Power Plant",
      "state": "TX",
      "county": "Comal County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q4 2026",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 1200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Evanston Power Station",
      "state": "WY",
      "county": "Uinta County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 1200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "NextEra Exxon Southeast Power Plant",
      "state": null,
      "county": null,
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 1200,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Bluegrass Power Generation Facility",
      "state": "OH",
      "county": "Fayette County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028/2030",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 1184,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Fort Cherry Power Station",
      "state": "PA",
      "county": "Washington County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 1000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Texas Critical Data Centers Power Plant",
      "state": "TX",
      "county": "Ector County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026/2027",
      "generating_technology": "Simple Cycle, Internal Combustion Engine",
      "reported_capacity_mw": 1000,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Pecos Power Generation",
      "state": "TX",
      "county": "Reeves County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 956,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Project Hummingbird Power Plant",
      "state": "PA",
      "county": "Greene County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2029",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 944,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Goodnight Data Center Power Plant",
      "state": "TX",
      "county": "Armstrong County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2027",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 933,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Featherwood Energies Pecos Power Plant",
      "state": "TX",
      "county": "Reeves County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2027",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 931,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Ashville Energy Center",
      "state": "OH",
      "county": "Pickaway County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 800,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "MMEX Pecos Power Plant",
      "state": "TX",
      "county": "Pecos County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": 640,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Verdant Power Plant",
      "state": "TX",
      "county": "Angelina County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 600,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "EdgeConneX New Albany North Power Plant",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 577,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Rock House Draw Generating Station",
      "state": "TX",
      "county": "Pecos County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q4 2025",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 576,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Eagle Mountain Power Plant (Aquila Project)",
      "state": "UT",
      "county": "Utah County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027/2028",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 521,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Misae Wilson Power Plant",
      "state": "TX",
      "county": "Wilson County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2028",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 519,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Apollo Generating Station",
      "state": "OH",
      "county": "Wood County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q3 2027",
      "generating_technology": "Simple Cycle, Internal Combustion Engine",
      "reported_capacity_mw": 514,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Aliquippa Data Center Power Plant",
      "state": "PA",
      "county": "Beaver County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 500,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Chickasha Industrial Park Power Station",
      "state": "OK",
      "county": "Grady County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028/2029",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 500,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Pacifico Ft. Spunky Power Plant",
      "state": "TX",
      "county": "Hood County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 473,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "PowerConneX New Albany 3 Energy Center",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 430,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Pampa Data Center Power Plant",
      "state": "TX",
      "county": "Gray County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 400,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "McCloud Generation Facility",
      "state": "TX",
      "county": "El Paso County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q2 2027",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 366,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Socrates the Younger Generating Station",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2H 2028",
      "generating_technology": "Internal Combustion Engine, Simple Cycle",
      "reported_capacity_mw": 350,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "PowerConneX I and II New Albany Energy Center",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Under Construction",
      "expected_operating_year": "2026",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 336,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Poolside Generating Station",
      "state": "TX",
      "county": "Pecos County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027/2028",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 332,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Socrates North Power Generation Facility",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Under Construction",
      "expected_operating_year": "2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 307,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Socrates South Power Generation Facility",
      "state": "OH",
      "county": "Licking County",
      "project_type": "New",
      "operating_status": "Under Construction",
      "expected_operating_year": "2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 307,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Fayetteville NetZero Data Center and Power Station",
      "state": "NC",
      "county": "Cumberland County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 300,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Tarboro NetZero Data Center and Power Station",
      "state": "NC",
      "county": "Edgecombe County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 300,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Wyalusing Energy Center",
      "state": "PA",
      "county": "Bradford County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q1 2026",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 248,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Remington Technology Park",
      "state": "VA",
      "county": "Fauquier County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Simple Cycle",
      "reported_capacity_mw": 215,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Circe Energy Data Centers E. Monahans Campus",
      "state": "TX",
      "county": "Ward County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2027",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 160,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "VoltaGrid SAT-2 Power Plant",
      "state": "TX",
      "county": "Bexar County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Q4 2025",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 149,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Lone Star Project",
      "state": "TX",
      "county": "Glasscock County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": 100,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Xenergy Monahans Power Plant",
      "state": "TX",
      "county": "Ward County",
      "project_type": "Expansion",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Internal Combustion Engine",
      "reported_capacity_mw": 98,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Data City Energy Center",
      "state": "TX",
      "county": "Webb County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2026",
      "generating_technology": "Unknown",
      "reported_capacity_mw": null,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Mesones Data Center Campus",
      "state": "TX",
      "county": "Williamson County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": null,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Tract Austin Power Plant",
      "state": "TX",
      "county": "Caldwell County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "2028",
      "generating_technology": "Combined Cycle",
      "reported_capacity_mw": null,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    },
    {
      "name": "Vermaland La Osa Data Center Campus Power Plant",
      "state": "AZ",
      "county": "Pinal County",
      "project_type": "New",
      "operating_status": "Proposed",
      "expected_operating_year": "Unknown",
      "generating_technology": "Unknown",
      "reported_capacity_mw": null,
      "source_as_of": "2026-04-30",
      "source": {
        "url": "https://environmentalintegrity.org/wp-content/uploads/2026/06/2026.05.14_BTM-Gas-Power-Plants.xlsx",
        "doc_genre": "third_party_inventory"
      }
    }
  ]
}