TCEQ O4721
Federal Operating Permit
Taylor, TX · Crusoe / Lancium → OpenAI via Oracle
Reviewed TCEQ records: original registration 177263 application received August 15, 2024; amendment issued January 22, 2025; Federal Operating Permit O4721 issued January 16, 2026. The 360.5 MW equipment cohort is a permit-based figure, not verified current output. Exact first-power day remains unverified.
Reviewed source ↗The capacity below describes a documented equipment cohort. Current delivered power, complete installed capacity and present operation of every unit are not established by this total.
Calculated from published unit count × unit rating. The export contains receipts for both field types, but row-level coverage can still vary.
Structured facts that have passed the review gate. Unknown values remain visibly unknown.
Regulatory, operational, satellite and court records are kept separate rather than blended into one unsupported conclusion.
TCEQ O4721 issued
TCEQ 177263 issued
TCEQ 177263 filed
Federal Operating Permit
EGU Standard Permit registration
Each receipt keeps the publisher’s original URL and an immutable BTW archive record. Public copies appear only when redistribution has been approved.
Supports: Facility Status, Unit Oem, Unit Model, Unit Unit Count, Unit Mw Each, Unit Basis, Unit Verification State, Unit Hours Permitted, Permit Permit No, Permit Permit Type, Permit Status, Permit Filed At
“Registration Number177263”
SHA-256 13bd44e0d6070bd8d1c616d4832c162dd7ee13fbe2e509e32e853248b3957176Supports: Facility Status, Facility Geo
Legacy scene reference: scene:wayback-2026-06-30-abilene-blockSupports: Permit Permit No, Permit Authority, Permit Permit Type, Permit Verification State
“Standard Permit Registration Number: 177263”
SHA-256 0c801ce20883f0048985505a27021c4ccbdab2bd6476ddd610c44561c94e3ba1Supports: Permit Permit No, Permit Permit Type, Permit Status, Permit Issued At, Permit Authority, Permit Verification State
“Permit No: O4721”
SHA-256 908e869b003eae12ac20db300a0959f473d4ba5f862ae1d359bb38a1e148cc0fSupports: Facility First Permit Filed
“Project Received DateAugust 15, 2024”
SHA-256 d137070b957b1a356aba850bac2b863989ab035e62201f8f7196f044fc8eb805