Skip to content

OPSB: what the 44 new records establish

44 docket entries triaged. Source-file review is incomplete. Two project updates are supported by a separately reviewed official OPSB status report.

The exact intake was first seen October 28 at 00:29 UTC, which was October 27 in Pacific time. The table below preserves all 44 record identities, original filing dates and descriptions. It does not turn older applications, studies or service notices into new project events.

Download the full review-status JSON · Read the interpreted change log

Two supported project findings

Socrates South: listed operational

OPSB’s September 17, 2026 status table lists 200 MW of gas generation with an August 3, 2026 operational date. This is a regulator status milestone; it is not a measurement of current delivered power.

STY: 250 MW gas; under construction

The same table gives June 25, 2026 as the approval date and marks STY under construction. The June 26 regulator announcement separately describes 116 MW of battery storage. An older uncited 296 MW turbine figure remains unresolved; no physical 46 MW reduction is established.

Primary evidence: OPSB Gas Generation & CHP Case Status, September 17, 2026, page 3. Page 1 explains the nameplate-capacity basis and excludes batteries from gas-capacity values. The reviewed PDF has three pages and is preserved in BTW’s private source archive.

What the October notices do not establish

The official docket describes a Condition 12 (2026 Q3) notice for Socrates South and a Condition 15 (2026 Q3) notice for STY. Without the PDFs, BTW cannot establish complaint counts, compliance outcomes, equipment changes or commissioning from these titles. A quarterly filing alone does not change a project’s physical status.

The rest of the batch includes earlier applications, technical appendices, responses and procedural filings. Their descriptions identify review subjects; their contents may contain material detail. They are retained as pending, rather than classified as having no material change.

All 44 records and their review state

Case 25-0185-EL-BLN is Socrates South. Case 26-0169-EL-BLN is STY. Every link opens the official document-record page.

Metadata triage; public file contents remain pending
Filed / caseOfficial docket descriptionReview state

25-0185-EL-BLN
Notice of Compliance with Condition No. 12 (2026 Q3) electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.New quarterly compliance filing — contents pending

26-0169-EL-BLN
Notice of Compliance with Condition No. 15 (2026 Q3) electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.New quarterly compliance filing — contents pending

25-0185-EL-BLN
Response to Requests and Comments from Licking County electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical agency/local response — technical review pending

25-0185-EL-BLN
Unopposed Petition of Intervention Out of Time electronically filed by Mr. Robert Dove on behalf of City of New Albany.Historical procedural filing — contents pending

25-0185-EL-BLN
Response to Staff's Fifth Data Request Dated May 2, 2025 electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Ohio Power Siting Board Staff'sThird Data Request electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Staff's Fourth Data Request Dated April 28, 2025 electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Staff's First Data Request electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Staff's Third Data Request Dated April 7, 2025 electronically filed by Teresa Orahood on behalf of Kara Herrnstein.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Staff's First Data Request Dated March 28, 2025 electronically filed by Teresa Orahood on behalf of Kara Herrnstein.Historical agency/local response — technical review pending

25-0185-EL-BLN
Response to Staff's Second Data Request Dated April 7, 2025 electronically filed by Teresa Orahood on behalf of Kara Herrnstein.Historical agency/local response — technical review pending

26-0169-EL-BLN
Notice of Proof of Service electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

25-0185-EL-BLN
Supplement Notice to Letter of Notification - Permit-to-Install electronically filed by Teresa Orahood on behalf of Dylan F. Borchers.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Confidential Document Target: Confidential Letter of Notification regarding the STY Power Generation Facility. (46 pages)Confidential target — metadata only

26-0169-EL-BLN
Motion for Protective Order and Memorandum in Support electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix A Figures electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix I Preliminary Grading Plan electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix H Preliminary Traffic Management Plan electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix D Geotech Report electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Public Appendix E Cultural Resources electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix B Preliminary Complaint Resolution Plan electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Confidential Document Target: Confidential Letter of Notification Appendix E - Cultural Resources Report.(104 pages)Confidential target — metadata only

26-0169-EL-BLN
Letter of Notification - Appendix G FAA Prescreen electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara, KARA.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix F Ecological Survey Report electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Letter of Notification - Appendix C Sound Modeling Report electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

26-0169-EL-BLN
Affidavit of Nickolaus Munoz electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

25-0185-EL-BLN
Notification of Appendix K - Stormwater Assessment electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Proof of Pub of Notice of Proposed Major Utility Facility electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

25-0185-EL-BLN
Proof of Service of LON electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

26-0169-EL-BLN
In the Matter of the Pre-application Notification Letter for STY Power Generation Facility Project electronically filed by Megan S. Zemke on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix B - Public Information Correspondence electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix A - Figures electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix E - Visibility Assessment electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Confidential Document Target: Document Letter of Notification Narrative electronically filed by Teresa Orahood on behalf of Will-Power OH, LLC. (51 pages)Confidential target — metadata only

25-0185-EL-BLN
Letter of Notification Appendix J - Traffic Management Plan electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix D - Geotechnical Engineering Report electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix I - Surface Water electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix H - Wildlife Habitat Study and Correspondence electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Motion for Protective Order and Memorandum in Support electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical procedural filing — contents pending

25-0185-EL-BLN
Letter of Notification Appendix C - Sound Study electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix F - Complaint Resolution Plan electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Narrative - Public Version electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
Letter of Notification Appendix G - Cultural Resolution Plan electronically filed by Teresa Orahood on behalf of Herrnstein, Kara.Historical application or technical attachment — contents pending

25-0185-EL-BLN
In the Matter of the Pre-Application Notification Letter electronically filed by Teresa Orahood on behalf of Dylan F. Borchers.Historical application or technical attachment — contents pending

Next evidence needed

  1. Read the public Q3 reports before describing their findings.
  2. Read the public STY narrative, staff report and amendments to reconcile turbine ratings with the regulator’s 250 MW project boundary.
  3. Compare Socrates South commissioning records with the August 3 operational date.
  4. Review historical technical appendices and responses before calling any configuration superseded or unchanged.

The confidential targets remain metadata-only. These research dossiers add no inferred equipment or MW to BTW’s reviewed unit fleet.